Operation; Control Panel - Franklin Electric Inline Control El Manual Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION

Control Panel

Green LED on
Yellow LED on
Red LED blinking
Button
Startup
Once the power is turned back on to the device, the green "Power On"
LED should be illuminated.
1.
Open a service point or tap in the system.
2. The pump should start and the yellow "Pump On" LED
should be illuminated.
3. The pump will run for several seconds to start the system.
You should begin to see water flowing from the faucet.
a. If this time is insufficient, the pump will stop and the
red LED will blink.
b. Press and hold the "Restart" button until the red LED
turns off and water flows from the faucet.
3. Close the service point and the pump will shut off in a few
seconds. The yellow "Pump On" LED should be off now. If the
pump does not shut off, refer to the Troubleshooting section.
4. Your device is ready to control your pump every time you use
water in the building.
8
Power On
Device energized
Pump On
Pump running
Failure
Water shortage
Restart
Reset after failure
Figure 8
P2
P1
Max 174 psi (12 bar)
Figure 9
Max 94 psi (6.5 bar)
Min 50 psi (3.5 bar)

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Inline flow

Tabla de contenido