Before Initially Putting Into Operation En - Abicor Binzel CR1000 Instructivo De Servicio

Recirculador de refrigerante
Ocultar thumbs Ver también para CR1000:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CR1000/CR1250
6.3 Before initially putting into operation
1
Coolant supply (blue)
2
Screw cap
Fig. 7
Front/rear
1 Connect the coolant hoses.
2 Open the screw cap (2) on the filler neck (3) of the coolant container (4).
3 Fill the cooling unit with ABICOR BINZEL BTC coolant up to the maximum fill level mark on the
container. Do not close the filler neck.
4 Switch on the cooling unit.
5 Fill the cooling unit at the filler neck (3) of the coolant container (4) with ABICOR BINZEL BTC coolant
up to the maximum fill level mark on the container.
6 Repeat this procedure approx. 2-3 times until the cooling liquid is distributed throughout the entire coolant
circuit and the maximum fill level has been reached.
7 Close the filler neck (3) with the screw cap (2).
Damage caused by unsuitable and conductive cooling liquids is not covered by the
warranty.
• Prior to refilling the cooling system with BTC coolant, the system must be rinsed with clean water to
• If other cooling liquids are used, they must not contain any aggressive, abrasive or resinous
• If ABICOR BINZEL BTC coolant is not available, deionized water (permitted operating temperature
1
2
6
3
Filler neck
4
Coolant container
CAUTION
remove any residues.
components.
+5°C to +40°C) or, after cleaning the device, a mixture of 25% monoethylene glycol and 75%
deionized water (permitted operating temperature -10°C to +40°C) can be used.
6 Putting into operation
3
4
5
5
Outlet neck
6
Coolant return (red)
EN - 13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cr1250

Tabla de contenido