Emerson InSinkErator C1300 Manual De Instalación, Cuidado Y Uso página 2

Ocultar thumbs Ver también para InSinkErator C1300:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Foodservice Equipment
Instant Hot Water Dispenser
Installation, Care & Use Manual
wHAT YOU SHOULD KnOw BEFORE YOU BEGIn
For your satisfaction and safety, read all instructions, cautions and warnings before installing or using this instant hot
water dispenser.
Make sure that all electrical wiring and connections conform to local codes.
A standard 115-volt grounded electrical outlet is required for the dispenser's electrical power.
The wall outlet powering the dispenser must have power supplied to it continuously.
It is recommended that a dedicated control valve be installed on the cold water line supplying water to this system.
If you suspect elevated levels of chlorine in your water, or your water has a rusty appearance before the installation
of this unit, it is recommended to use our water filtration system.
This product contains stainless steel. The manufacturer cannot guarantee against rusty water because of the number
of factors that are involved beyond the manufacturer's control. However, the sudden appearance of rusty water
discharged from the hot water dispenser may indicate the need for service or replacement of this product.
Moving parts inside the tank causing a rattling noise is normal.
Equipment Required:
Drill
n
T-fitting
n
Dedicated control valve
n
Adjustable wrench
n
Equipment You May need:
Anchors for drywall
Hole saw
In THIS PACKAGE
Hex Nut
Hex Tool
C1300
1-1/2" Extension
Rubber O-Ring
H778
4" Extension
Fiber Gasket
Mounting Plate
2
Phillips and flat blade screwdrivers
n
Pencil
n
Tape measure
n
Level
n
Basin wrench
Hole punch
Brass Nut / Ferrule /
Tube Insert
Semi-circular
Snap-Connect
Mounting Plate
3/4" Screws (2)
Fitting (3 pieces)
Brass Nut / Ferrule /
Tube Insert
Snap-Connect
Semi-circular
Wing Nut
3/4" Screws (2)
Fitting (3 pieces)
OVERVIEw OF A
COMPLETED SETUP
START HERE
1
PREPARATIOn
a
Required minimum from
center of hole to wall
C1300 ............... 4
H778 ................. 2"
Note: Hole size requirement is 1
The wall outlet for your dispenser must have
power supplied to it continuously and must be
fused. It should not be controlled by the same
wall switch that operates your disposer.
b
If you have to drill through
sink or countertop, you may need to
rent or purchase the appropriate tools.
Tank
This appliance must be grounded. This instant hot water dispenser is equipped with a cord that has
a grounding conductor and a grounding pin. The plug must be connected to an appropriate outlet that is
properly installed and grounded in accordance with all local codes and ordinances.
Do not modify the plug provided with the appliance.
Tank
proper installation should take aBout 2-4 hours
Identify locations for the dispenser
faucet, tank and filter (if applicable).
"
3
Check to make sure there is proper
8
clearance (see chart at left) for
dispenser handle to be fully opened.
1
" – 1
1
"
4
2
Check to make sure counter is 3"
thick or less.
Make sure there is a grounded
electrical outlet within 30" of the tank.
Turn off water supply.
If using the sink sprayer hose hole,
remove nut that connects sprayer
hose at bottom of faucet.
Using adjustable wrench, remove nut
connecting sprayer washer flange in
sprayer hole.
Plug hose opening with either a 1/8"
plug or a 1/4" cap (not supplied).
Electric Shock Hazard: Using an ungrounded or improperly connected
appliance can result in serious injury or death from electrical shock.
For Technical Assistance
For Technical Assistance
1-800-845-8345
1-800-845-8345
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Insinkerator h778

Tabla de contenido