Assembly Of The External Switch Cabinet - Graf Klaro E Professional Instrucciones Para El Montaje

Sistema profesional en un tanque séptico carat s
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Switch cabinet for outdoor use
2-10 Inhab.
5.3

Assembly of the external switch cabinet

For setting up outside, there is the plastic external switch cabinet that must be set into the ground to the
level of the marking on the column and is attached to the front side of the control box. For this purpose
there must be a hole excavated of sufficient depth (see image). The position of the switch cabinet
assembly should be chosen so that it is not in continuous direct sunlight as this may cause overheating in
summer.
The empty conduit for the four air hoses and the underground electricity supply cable is to be laid so that
the hoses and cable can be led from directly below up into the column.
Finally, the excavated hole is to be refilled according to good professional practice and so that the column
sits firmly and vertically in the ground.
info@graf.info
www.graf.info
5.
Assembly of the switch cabinet
20 / 44
Installation depth
max. 639 mm
Switch cabinet for outdoor use
12-18 Inhab.

Publicidad

Tabla de contenido
loading

Tabla de contenido