Position Of Emergency Overflow And Outlet Pipe; Final Assembly Of The Ventilation Apparatus - Graf Klaro E Professional Instrucciones Para El Montaje

Sistema profesional en un tanque séptico carat s
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.2

Position of emergency overflow and outlet pipe

The position and location of the outlet pipe depends on the position of the baffle. The distance between
the baffle and the beginning of the straight outlet pipe is 430 mm. The baffle spot is the outer surface of
the top central lying rip. At the installation the emergency overflow has to be pushed about 60 mm onto
the outlet pipe.
4.3

Final assembly of the ventilation apparatus

Remove the Klaro E Professioinal installation
kit from the packaging and screw the short
stainless steel tube (length 350 mm) on to
the stainless steel 90° elbow on the down
pipe.
Then carefully screw the disc aerator into the
thread provided until hand-tight. Please note
that all threads must be wrapped with Teflon
tape, see illustration.
info@graf.info
www.graf.info
4.
Assembly of machinery
4 3 0
Pre-
SBR-
treatment/
reactor
S ch la m m -
S B R -
Sludge
s p e ic h e r/
R e a kto r
storage
P u ffe r
(A S )
Baffle
T re n n w a n d
down pipe
Seal all therads with
Teflon tape!
Montage disc aerator
16 / 44
KG outlet pipe
K G A b la u f-
4 3 0
ro h r
Emergency
overflow
N o tü b e rla u f
Disc diffuser
Tighten plastic
thread until
hand-tight

Publicidad

Tabla de contenido
loading

Tabla de contenido