Bradley SN2013/TT Manual De Instalación página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SN2013/TT, SN2033/TT
4
Connect Drain
Off-Line Vent (Type A or O): Connect 1-1/2" P-Trap and
drain piping (supplied by installer) to the drain spud .
Centrally Rising Vent (Type B or H) or models with
optional paper towel dispensers: Connect the vented
P-Trap (provided) and drain piping as shown .
5
Turn on Water and Electricity, Test and Adjust Unit
A
Turn on power to transformer . Turn on water supply
and check for leaks . Activate each TT Sensor to
purge air from the lines .
C
8
Using the cover, turn
the cartridge gently until
desired water temperature
is reached . Do not turn past
stops as this may damage
the unit . Push the cover
down and tighten the screw .
10/21/2014
Strainer
Drain Spud
Tailpiece
P-Trap
Check to make sure stop valves are open
before turning on water.
C
H
Bradley • 215-1762 Rev. A; ECN 14-00-007
Installation
1-1/2" NPT Vent
Pipe (supplied by
installer)
1-1/2" NPT Tee
1-1/2" NPT Close
Nipple
1-1/2" Drain
(supplied by
installer)
Loosen the cap screw about
B
¼" (4–6 turns) and lift up
the cover (do not remove) .
This valve is NOT factory preset.
Upon installation, the temperature
of this valve must be checked and
adjusted to ensure delivery of a
safe water temperature. Water
in excess of 110°F (43°C) may
cause scalding.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sn2033/tt

Tabla de contenido