Eaton PORTFOLIO LSR4B Instrucciones De Instalación página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions – LSR4B / LSSQ4B Commercial LED Rough-In
INSTALLATION
N
otee:
LED and Trim assembly to be installed only after
cylinder is installed.
Surface Mount Cylinder Bracket
1.
Remove locking screw.
2.
Rotate the mounting plate in anticlockwise direction to
separate from assembly and to remove from cylinder
(Figure 1.).
3.
Attach mounting plate to Junction Box.
4.
Attach tether under one Junction Box mounting screw
(Figure 3.).
5.
Wire Unit per appropriate Wiring Diagram (refer to
electrical section). Push wiring into Junction Box.
6.
Insert tabs from mounting plate in to cylinder top.
Rotate cylinder clockwise to engage hooks.
7 .
Ensure holes are aligned, install Locking screw.
Trim
1.
Remove lower trim from protective packaging. Remove
plastic and discard trim ring then rotate side clips (3)
outwards (Figures 4 & 5.). Remove LED Engine from
protective packaging.
2.
Insert LED engine on to trim assembly. Align post on
Figure 1.
Luminaire
Quick
Disconnect
LED Engine
Trim Assembly
Figure 2.
2
Fiberglass
Sleeve
Torsion
Springs
Installation Instructions – LSR4B / LSSQ4B Commercial LED Rough-In
IB520036ML
Figure 3.
Figure 4.
Figure 5.
Figure 6.
www.eaton.com
Mounting
Plate
Tether

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Portfolio lssq4b

Tabla de contenido