6 Mounting the Gateway
2. When mounting on the frame construction, put
the bracket of the Gateway on two screws that
are anchored on the frame construction and
attach the Gateway with suitable washers and
nuts (hole diameter in the bracket of the
Gateway: 9 mm (0.35 in)). The cable glands at
the Gateway must face downwards. This will
ensure that no moisture can penetrate the
Gateway.
3. Ensure that the Gateway is securely in place.
4. Install additional Gateways if required. Note that maximum of three Gateways can be
connected to one Cloud Connect Advanced.
26
RoofCommKit-P1-US-IA-xx-11
SMA Solar Technology America LLC
Installation Manual