Commissioning The Rooftop Communication Kit - SMA RoofCommKit-P1-US-IA-11 Serie Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SMA Solar Technology America LLC
7 Commissioning the Rooftop Communication Kit
1. Commission the inverter (see inverter manual).
2. Switch on the circuit breaker of the Rooftop Communication Kit and the Rapid Shutdown
initiator.
3. Integrate the Cloud Connect Advanced into a network with Internet connection.
• Integrate Cloud Connect Advanced via Ethernet into the network. For this, the inverter
must be integrated via Ethernet into the network. Cloud Connect Advanced is
automatically connected to the network via the inverter.
• Integrate Cloud Connect Advanced via WLAN into the network. For this, integrate Cloud
Connect Advanced separately from the inverter via WLAN into the network (see manual
of the Cloud Connect Advanced).
4. Register the system in the portal of Tigo Energy (see manual of the Cloud Connect Advanced).
5. In installations with optimizers of type TS4-R-O, the function SMA OptiTrac Global Peak of the
inverter has to be deactivated via the user interface of the inverter (see manual of the inverter).
For installations with optimizers of type TS4-R-S, the function can remain activated.
6. Register the system in Sunny Portal and detect the TS4-R components in Sunny Portal
(www.SunnyPortal.com).
Installation Manual
7 Commissioning the Rooftop Communication Kit
RoofCommKit-P1-US-IA-xx-11
27

Publicidad

Tabla de contenido
loading

Tabla de contenido