GB
INSTALLATION
SECTIONAL DOOR:
using suitable screws and plugs. The guide should ideally be installed at approx. 40 mm. above the section door
Fig. 7
Fig. 9
SPRING UP-AND-OVER DOOR:
frame using suitable screws and plugs.
The guide should ideally be installed at approx. 40 mm above the door transit area (as per sectional doors). Level
COUNTERWEIGHT UP-AND-OVER DOOR:
up-and-over door on the highest cross-member and at the end opposite one of the horizontal cross-members.
arm by means of at least two screws and respective nuts (not supplied).
Fig. 8
Fig. 10
51