PC Locs Carrier 10 Charging Station Instrucciones Para El Usuario página 6

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18
Carrier 10 Charging Station™
STEP 5 - Mounting the Carrier 10 Charging Station
IMPORTANT: Only a suitably qualified installer may mount this unit. Refer to a
structural specialist to determine if the wall you intend to mount this unit on is
capable of supporting the fully loaded Carrier 10 Charging Station.
Note the mounting holes for wall mounting:
TOP
Note the mounting holes for desk mounting:
STEP 6 - Resetting the Power Strips
If there is a power surge and the power is tripped in the Carrier 10 Charging Station,
press the red reset button on each power strip to reset.
Refer to drilling drawing for correct hole locations.
Note the mounting holes for wall mounting:
BOTTOM

Publicidad

Tabla de contenido
loading

Productos relacionados para PC Locs Carrier 10 Charging Station

Tabla de contenido