Indoor Unit Installation - Friedrich DUCTLESS Manual De Instalación

Ocultar thumbs Ver también para DUCTLESS:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Indoor Unit Installation

- Select and mark the position for fixing bolts.
- Drill the hole for set anchor on the face of
ceiling.
- Insert the set anchor and washer onto the
suspension bolts for locking the suspension
bolts on the ceiling.
- Mount the suspension bolts to the set
anchor firmly.
- Secure the installation plates onto the sus-
pension bolts (adjust level roughly) using
nuts, washers and spring washers.
Old building
1 Set anchor
2 Plate washer
3 Spring washer
4 Nut
5 Suspension
bolts
• Local supply
① Set anchor
② Plate washer
③ Spring washer
④ Nut
⑤ Suspension bolt - W3/8 or M10
New building
- M10
- M10
- W3/8 or M10
CAUTION
!
Tighten the nut and bolt to prevent unit
falling.
9

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido