Pando E-251 Guia Instalacion página 23

Ocultar thumbs Ver también para E-251:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

E-251 INSTALLATION MANUAL
SYNCRONIZATION OF THE REMOTE CONTROL (ceiling hoods E-200/210 series)
Light
When the hood is installed and the differencial case is switched on, before 20 seconds
pass, please keep pressed the button "light" until the lights of the hood swith on. This
way the hood records the operating frequency of the remote control and toperating of
the hood is correct.
The synchronization of the remote control can be canceled because of the cut power. So
the new synchronization is necesary.
* Syncronization of the remote control with the hood:
– Switch off the circuit breaker , o switch off the the hood by pressing switch of the diferencial
case.(see photo).
2 – Switch on the circuit breaker o the diferencial case of the hood.
3 - IMPORTANT: when the step 2 is done, but before 20 seconds pass, please direct the re-
mote control to the hood and keep pressed the button "Light" until the lighst of the hood
swith on.
4.- The operating frequence of the hood is recorded and the hood is synchronized.
¡¡¡Important!!!
* switch/
diferencial case
Página 8
Page 8

Publicidad

Tabla de contenido
loading

Tabla de contenido