Cooper Lumiere Boca 696 Instrucciones De Instalación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions – Boca 696
BUCKET INSTALLATION
To prevent water, dirt and debris from collecting, install fixture to allow run off. Do not install fixture in areas
where water can collect for long periods of time. Appropriate drainage must be provided.
Excavated hole must be approximately 12" in diameter by 15" in depth. Fixture must be installed with a minimum 4"
depth of pea gravel or equivalent drainage base. Backfill an additional 5" depth of pea gravel on lower portion of fixture
for soil stability.
1. Dig Hole
3"
For Reference See "Installation Application. "
Keep recessed screw locations clear of debris.
This will help to ensure complete seal.
Figure 3.
3. Install Debris or Concrete Pour Cover
Figure 5.
4
CAUTION
4"
For Stability Backfill
Hole With Gravel or
Soil. Do Not Backfill
With Sand or Bark.
4. Debris Cover Concrete Installation
Keep gasket
surface
Clean and
Clear of
Debris
Note: Keep
recessed screw
locations clear of
debris. This will
help to ensure
complete seal.
Figure 6.
Installation Instructions - Boca 696
IL509001ML
2. Sealing Bucket
Feed power leads
1
through conduit
Gray duct sealing
2
compound (not included)
Re-enterable potting seal
3
material (not included)
Figure 4.
www.cooperlighting.com
Remove conduit
plug for through
branch wiring
Flush Pour Cover
Before Pour Finish Grade
Finish Grade
Trim
After Pour Finish Grade

Publicidad

Tabla de contenido
loading

Productos relacionados para Cooper Lumiere Boca 696

Tabla de contenido