Installation Instructions – Boca 696
Surface Mount Installation
5. Locate recessed holes to #6-32 screw through holes.
1 Remove gasket from top of bucket. Do not damage.
2 Locate locations highlighted by the circles and use a
11/64" . drill bit to drill a through hole (4X).
NOTE: Glasses, gloves, and mask are recommened
when drilling since the bucket is a glass-filled material.
Figure 11.
Internal Components and Wiring
7. Wiring Diagram
Low Voltage
Lamp Housing
Lamp housing
lead wire color
may vary.
Input power
12 Volts
Figure 13.
6
Line Voltage
Lamp Housing
with magnetic
step down
transformer
Input power
Line Voltage
Installation Instructions - Boca 696
IL509001ML
www.cooperlighting.com
6. Screw Insert and Repalce Gasket
Attach bucket to surface with four (4) #6-32 screws
3
(Provided by Others).
IMPORTANT: DO NOT OVER TIGHTEN SCREWS.
Tighten screws by hand as to not damage bucket.
IMPORTANT: Replace gasket.
4
IMPORTANT: Install trim: Standard Trim for
5
recessed flooring application and Surface
Mount trim for surface mount applications.
Figure 12.
8. Install Lamp Housing
insert lamp housing
into bucket after making
electrical connections.
WARNING
RISK OF ELECTRIC
SHOCK—
Disconnect power
at fuse or circuit
breaker before
installing or
servicing.
Heat Shield Plate
All wiring connections must
be made below heat plate
with waterproof wirenuts (not
included)
Figure 14.