NEW CONSTRUCTION ASSEMBLY INSTRUCTIONS
BEFORE INSTALLATION – Turn off power source.
Review all safety precautions.
1.
Attach the duct connector (C) to the fan housing (A).
2.
Remove the wiring box cover (2.1) from the fan
housing (A). Remove the wiring knockout (2.2) from
the wiring box cover (2.1) with a flathead screwdriver
(not included).
3.
Place the fan housing (A) next to a ceiling joist. The
fan housing should be level and perpendicular to the
joist.
1
A
2
2.1
3
6
C
2.2
7.1
A
A
Joist