INSTALLATION INSTRUCTIONS
Horizontal Baby Changing Station Surface Mounted
Model Number KB100 and KB110-SSWM
Step 1.
Remove changing station from the shipping container and check for any freight
damage. Identify the best location for installing the unit. Hold the unit in place
and open the bed. Make sure you have taken the operating clearance into
consideration.
Step 2.
Based upon the type of wall on which you will be mounting the station, determine
the best method of mounting. You may have left over hardware when you are
finished with installation.
Step 3.
The horizontal unit has four mounting holes provided in the back wall of the unit.
The four holes are positioned on a 32" (813mm) stud center.
If possible, locate the wood or metal studs for fastening the changing station in
the desired location. If the walls do not have studs on center as outlined, make
sure at least one side of the unit is installed into the stud. Use toggles (may have
to purchase) for holes on the other side.
2