Daikin EWAP 060 Instalación Funcionamiento Mantenimiento página 19

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 62
Table 8 - Minimum water loop volume for comfort application
Water volume (l)
At Eurovent conditions
CG-SVX04C-E4
Installation
Minimum water volume for a
process application or for a chiller
which has to run with low ambient
temperature option.
For Process application we have to
minimize the water temperature
fluctuation at part load. In order to
avoid problem on a scroll or a
hermetic reciprocating compressor it
must run at least 2 minutes
(120 seconds) before it stops and the
minimum time between two starts is
5 minutes (300 seconds).
The water volume has to be able to
provide the cooling capacity while
the unit is shut down.
The minimum volume can be
determined by using the following
formula
Volume = Cooling capacity x Time
x highest capacity step (%) / Specific
heat / Dead band
With these values the formula
becomes
Volume = Cooling capacity
X 9.56 x highest capacity step (%)
For the EWAP running in following
conditions: Air temperature 35°C,
water 12/7°C, this gives the following
volumes. If the total water volume of
the installation is below the above
mentioned values it is necessary to
use a buffer tank.
EWAP
EWAP
EWAP
EWYP
EWYP
EWYP
060
080
100
360
360
610
EWAP
EWAP
EWAP
EWYP
EWYP
EWYP
120
125
130
640
620
370
Minimum time = 180 seconds
(300-120)
Specific heat =4.18 kJ / kg
Dead band recommended =
Function of the process
With these values the formula
becomes:
Volume = Cooling capacity x 43
x highest capacity step (%) / Dead
band
Increasing the dead band is like
adding water volume to the loop.
EWAP
EWAP
EWAP
EWYP
EWYP
EWYP
160
180
210
370
500
650
EWAP
EWAP
EWYP
EWYP
240
260
760
630
19

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido