Service Space; Inspecting, Handling And Unpacking The Unit; Inspection; Handling - Daikin VRV III REYAQ10P7Y1B Manual De Instalación

Unidad exterior del sistema
Ocultar thumbs Ver también para VRV III REYAQ10P7Y1B:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 124

7.2. Service space

The space around the unit is adequate for servicing and the minimum
space for air inlet and air outlet is available. (Refer to the figure below
and choose one of the possibilities).
b
a
c
d
b
a
e
d
b
a
e
f
d
b
a
e
d
b
a ≥10 mm
a ≥50 mm
b ≥300 mm
b ≥100 mm
c ≥10 mm
c ≥50 mm
d ≥500 mm
d ≥500 mm
a ≥10 mm
a ≥50 mm
b ≥300 mm
b ≥100 mm
c ≥10 mm
c ≥50 mm
d ≥500 mm
d ≥500 mm
e ≥20 mm
e ≥100 mm
a ≥10 mm
a ≥50 mm
b ≥300 mm
b ≥100 mm
c ≥10 mm
c ≥50 mm
d ≥500 mm
d ≥500 mm
e ≥20 mm
e ≥100 mm
f ≥600 mm
f ≥500 mm
a ≥10 mm
a ≥50 mm
b ≥300 mm
b ≥100 mm
c ≥10 mm
c ≥50 mm
d ≥500 mm
d ≥500 mm
e ≥20 mm
e ≥100 mm
h
2
h
1
A B C D Sides along the installation site with obstacles
Suction side
Installation manual
9
e
c
c
c
a ≥200 mm
b ≥300 mm
a ≥200 mm
b ≥300 mm
e ≥400 mm
In case of an installation site where sides A+B+C+D have
obstacles, the wall heights of sides A+C have no impact on
service space dimensions. Refer to the figure above for
impact of wall heights of sides B+D on service space
dimensions.
In case of an installation site where only the sides A+B have
obstacles, the wall heights have no influence on any
indicated service space dimensions.
The installation space required on these drawings are for full
load heating operation without considering possible ice
accumulation.
If the location of the installation is in a cold climate, then all
dimensions above should be >500 mm to avoid accumulation
of ice in between the outdoor units.
8.
I
,
NSPECTING
HANDLING AND UNPACKING
THE UNIT

8.1. Inspection

At delivery, the unit must be checked and any damage must be
reported immediately to the carrier's claims agent.

8.2. Handling

When handling the unit, take into account the following:
1
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor
damage.
2
Choose on beforehand the path along which the unit is to be
brought in.
3
Bring the unit as close as possible to its final installation position
in its original package to prevent damage during transport.
4
2
1
1 Packaging material
2 Belt sling
3 Opening
4 Protector
4
Lift the unit preferably with a crane and 2 belts of at least 8 m
long as shown in the figure above.
Always use protectors to prevent belt damage and pay attention
to the position of the unit's centre of gravity.
NOTICE
Use a belt sling of ≤20 mm wide that adequately
bears the weight of the unit.
A forklift can only be used for transport as long as the unit
remains on its pallet as shown above.
2
2
4
3
4
4
3
REYAQ10~16P7Y1B
VRVIII system outdoor unit
4PW62582-1A – 08.2011

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vrv iii reyaq12p7y1bVrv iii reyaq14p7y1bVrv iii reyaq16p7y1b

Tabla de contenido