2. Prepare the Site — Wall Plate(s)
Determine the desired mounting location.
Mark the vertical and horizontal center lines for the accessory to be
installed. Consult the roughing-in diagrams to determine the
dimensions.
When installing multiple-post accessories, provide the required
distance between the center points.
Use a level to ensure that all center points are level.
3. Mark and Drill the Pilot Holes
Mark the pilot hole locations vertically 9/16" (1.4cm) above and
below each center point.
Vertically align the holes on each wall plate. Make sure the larger
hole is on the bottom.
If the installation requires multiple posts, confirm that the center
points are even using a level.
NOTE: There is no provision for later adjustment if the center points
and resulting pilot holes for multiple post accessories are not level.
Select a drill and 5/16" drill bit that are appropriate for the wall
material you will be drilling through.
1020118-2-B
4
Kohler Co.