Before You Begin; Electrical Requirements; Tools You Will Need - GE AKL08 Manual Del Propietario E Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Preparing to install the air conditioner.
Read these instructions completely and carefully.

Before You Begin

NOTE TO INSTALLER: Leave these instructions with
the air conditioner after installation is completed.
NOTE TO CONSUMER: Keep this Owner's Manual
and Installation Instructions for future use.
IMPORTANT NOTES:
For personal safety, this air conditioner must be
properly grounded.
It is important to have the wall outlet and circuit
checked by a qualified electrician if there is any
doubt as to whether a proper ground exists.
Follow National Electrical Codes (NEC) and/or local
codes and ordinances.

Electrical Requirements

Some models require 115/120-volt a.c.,
60 Hz grounded outlet protected with a
15-amp time delay fuse or circuit breaker.
The 3-prong grounding plug minimizes the
possibility of electric shock hazard. If the wall outlet
you plan to use is only a 2-prong outlet, it is your
responsibility to have it replaced with a properly
grounded 3-prong wall outlet.

Tools You Will Need

s
Phillips-head screwdriver
s
Adjustable wrench
s
Ruler or tape measure
s
Drill
CAUTION:
Do not, under any circumstances, cut or remove
the third (ground) prong from the power cord.
Do not change the plug on the power cord of this
air conditioner.
Aluminum house wiring may present special
problems—consult a qualified electrician.
Some models require 230/208-volt a.c.,
protected with a time delay fuse or circuit
breaker. These models should be installed
on their own single branch circuit for best
performance and to prevent overloading
house or apartment wiring circuits, which
could cause a possible fire hazard from
overheating wires.
s
Scissors or knife
s
Pencil
s
Level
9

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Akn08Akq08Akv08Akw08

Tabla de contenido