Fixation After Connection Pipes - Toshiba RBM-PMV0361E Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6

FIXATION AFTER CONNECTION PIPES

1. After connection to pipes, fix the PMV Kit using the attached binding band so that it is held
closely to the gas pipe.
Binding band L
Binding band M
Heat insulating pipe
Refrigerant pipe
(Liquid side)
2. Set the hanging bolts for supporting pipes which are mounted at front and rear sides of PMV
Kit at within 1m intervals.
Hanging bolt
Binding band M
Binding band M
1 m or less
PMV Kit
10
Binding band L
Binding band M
Refrigerant pipe
(Gas side)
Heat insulating pipe
Refrigerant pipe
(Liquid side)
Hanging bolt
Refrigerant pipe

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rbm-pmv0901e

Tabla de contenido