Descargar Imprimir esta página

Kohler K-98740 Guia De Instalacion página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

9"
(229 mm) -
9-1/4"
(235 mm)
4. Install the Finished Ceiling
Install the water-resistant wall board.
Cut out a 9" (229 mm) to 9-1/4" (235 mm) square at the desired
installation location.
Install the finished wall material.
5. Install the Pipe Nipple
Remove the nipples.
NOTE: The minimum distance between the face of the tees/elbows
and the surface of the finished ceiling should be 2-1/4" (57 mm).
The measurement for typical installations is 2-3/4" (70 mm).
Measure the distance from the face of the tees/elbows to the
surface of the finished ceiling. Make any adjustments as needed.
If your measurement is 2-1/4" (57 mm): Use close pipe nipples.
If your measurement is 2-3/4" (70 mm): Use 1-1/2" pipe nipples.
Thread the nipple into the tee/elbow and hand tighten.
1207715-2-B
Finished Ceiling
Cutout
Finished
Ceiling
Cutout
Tee
9" (229 mm) -
9-1/4" (235 mm)
Nipple
6
Tee
2-1/4"
(57 mm)
Min
9"
(229 mm) -
9-1/4"
(235 mm)
Kohler Co.

Publicidad

loading