MOUNTING THE EVSE CHARGING STATION
Additional Parts (supplied):
• Mounting bracket
• Mounting hook (factory installed)
• No. 7 screws - for mounting bracket (4)
NOTE: A suitable hook (not supplied) is recommended to secure the charge connector cord if
the EVSE Charging Station is to remain mounted when not in use (refer to Mounting Diagram).
Mounting Location
The EVSE Charging Station should be located in close proximity to the electric vehicle's parking
location and positioned so that the AC power plug can be properly inserted into a NEMA 6-30
outlet. The EVSE Charging Station must connect to the electric vehicle via a charge connector
and charge connector cord. NOTE: The path from the EVSE Charging Station to the electric
vehicle should be free from obstacles, and be within the range of the charge connector cord
(18 feet standard length). The EVSE Charging Station must be mounted at a sufficient height from
grade such that the bottom of the unit is between 24 - 48 in. from grade per NEC Article 625.
STEP 1
Mount bracket to wall using appropriate
screws/wall anchors for your specific
installation location.
STEP 3
Slide the EVSE Charging Station onto the
mounting bracket until the hook snaps into
place.
3
Tools:
• Drill (for pilot holes - if required)
• Phillips screwdriver
STEP 2
Note location of the hook on the back of the
EVSE Charging Station.
STEP 4
To remove, push the latch on the mounting
bracket and move EVSE Charging Station
upward.