Important; Pre-Installation Information - Bradley S19-270B Instalación

Lavador de ojos con brazo oscilante
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

S19-270B
Read this installation manual completely to ensure proper installation, then file it
Installation
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
discarding any packaging material. If any parts are missing, do not begin installation
IS
T H
E
S ID
until you obtain the missing parts.
U P
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eyewash should be "ON" at all times. Provisions shall be made to prevent unauthorized
shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI
Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance
with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per ANSI
Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties may also be found under "Product Information" on our web site at
www.bradleycorp.com.
2

IMPORTANT

5/16/11
Bradley Corporation • 215-634 Rev. V; ECM 11-05-004
Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido