Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 56
To ensure that this Docking Station remains in good operating condition, it is important to keep it clean and carry out the routine
maintenance procedures described below. All servicing should only be performed by a qualified service engineer with reference to the
Technical Service Manual (TSM).
Circuit diagrams and components parts lists and all other servicing information which will assist the qualified service engineer in performing
repair of the parts designated as repairable are available upon request from CareFusion.
A
If the Docking Station is dropped, damaged, subjected to excessive moisture or high temperature, immediately take it
out of service for examination by a qualified service engineer.
All preventative and corrective maintenance and all such activities shall be performed at a compliant work place in
accordance with the information supplied. CareFusion will not be responsible should any of these actions be performed
outside the instructions or information supplied by CareFusion.
Interval
When loading an Alaris®
Infusion Pump
When removing an Alaris®
Infusion Pump
As per Hospital Policy
At least once per year
(Refer to TSM for identification
of parts)
If the AC power indicator light does not illuminate when the Docking Station is connected to the AC power supply and switched ON, either
the power supply fuse in the AC plug, if fitted, or the internal fuses have blown.
First check the power supply fuse in the AC mains plug, if fitted. If the AC power indicator light does not illuminate remove the Docking
Station from service.
It is recommended that only a qualified service engineer replaces the AC fuses. For further information regarding the replacement of
internal AC fuses refer to the Technical Service Manual.
If the fuses continue to blow, suspect an electrical fault and have the pump and power supply checked out by a
A
qualified service engineer.

Maintenance

Routine Maintenance Procedures
Routine Maintenance Procedure
Check that each pump is properly located on its electrical connectors and is mechanically locked into
position.
Check that the red LED turns OFF when the pump is removed. If the LED stays ON, the Docking Station
should be serviced by a qualified service engineer.
Thoroughly clean external surfaces of the Docking Station before and after prolonged period of
storage.
1. Inspect AC outlets, communication connectors, AC power supply plug and cable for damage.
2. Perform electrical safety checks. The complete unit leakage current must be measured. If more
than 500μA the Docking Station should not be used, but should be serviced by a qualified service
engineer.
Replacing the AC Fuses
1000DF00444 Iss. 2
11/210

Publicidad

Tabla de contenido
loading

Tabla de contenido