Installation Instructions; General Requirements; Combustion Air Supply - Bullerjan 0042 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3. Installation instructions

3.1 General requirements

The installation of the Bullerjan
hot air stoves and associated
®
chimney system must be installed in accordance with the relevant
public building safety codes, in particular the fireplace safety code
and the applicable Federal State regulations.

3.2 Combustion air supply

In any case, the room of installation should have a minimum volume
of 4m
/kW of rated thermal output.
3
The air supply for Bullerjan
hot air will be sufficient if the room
®
where the stove is located is provided by at least one door leading
into the open air and by a window which can be opened.
31

Publicidad

Tabla de contenido
loading

Tabla de contenido