Post Installation Verification and Configuration
Use the checklist below to verify that the system is properly connected and configured.

Installation and Wiring

1.
Make sure the distances between the system components are as specified in the installation guide.
2.
Take a picture of each of the system components after wiring them and send the pictures to SolarEdge support.
Inverter
Battery
Energy Meter
3.
Make sure the battery is installed according to the manufacturer's instructions.
4.
Make sure the DIP switches of all components are set correctly.
5.
Make sure all DC, communication and AC cable connections are completed as follows:
Check the AC wiring and the AC circuit breaker on the AC distribution panel.
Check the string DC input voltage. Expect 1V per optimizer in a string.
Make sure all components are properly grounded.
Check the DC connection between the battery and inverter.
Check the CAN bus connection between the battery and inverter.
Check the CT, AC and RS485 connections to the Energy Meter.
6.
Check connection to Monitoring Platform:
In SetApp, select Commissioning > Status.
Check that S_OK - Server Connected appears in the main inverter section.
Configuring the Meter and Battery
1.
Switch the inverter ON/OFF/P switch to ON.
2.
Open SetApp and select Commissioning > Communication.
3.
From the Communication screen, select RS485-1 > Protocol > Modbus (Multi-Device).
4.
Return to the previous screen and select Add Modbus Device > Meter.
5.
Set the meter's CT Rating according to the CT specifications. If the CT rating value returns to 0, check
communication with the CT.
6.
Select Meter 1 > Meter Function > Export+Import (E+I).
7.
Make sure the battery's circuit breaker switch is ON.
8.
Switch the inverter ON/OFF/P switch to OFF.
9.
Open SetApp and select Commissioning > Communication > CAN.
10.
On the Batteries screen that opens, select your battery type from the list.
MAN-01-00654-1.0 StorEdge Three Phase Inverter Wiring and On Site Check Quick Guide