Ferroli BlueHelix HiTech RRT C Instrucciones De Uso, Instalación Y Mantenimiento página 314

Ocultar thumbs Ver también para BlueHelix HiTech RRT C:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

BlueHelix HiTech RRT C
System draining
The drain cock ring nut is located under the
safety valve inside the boiler.
To drain the system, turn the ring nut (ref. 3
- fig. 27) counter-clockwise to open the
cock. Do not use any tools; use hands only.
To drain only the water in the boiler, first
close the shut-off valves between the sys-
tem and boiler before turning the ring nut.
3
fig. 27
314
EN
cod. 3541V300 - Rev. 00 - 02/2021

Hide quick links:

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido