When installing the KTC follow these instructions carefully:
Always RESPECT all laws and regulations and regulations in force in the country where the
installation is carried out.
INSTALL both units either in electrical boards or in casing which guarantees the same or
more protection than IP65.
INSERT, in both units, a switch to open the power supply.
USE a Safety Transformer for the power supply both in the transmitting unit and in the
receiving unit (see EN 60204-32 paragraph 6.4).
DO NOT by-pass the safety circuits in the KTC and/or in the system in which it is installed.
DO NOT MODIFY, TAMPER WITH OR PERFORATE the KTC units.
CHECK the values given in the "Technical Data" to ensure that
- the power supply voltage in the transmitting and receiving units falls within the range
specified for each unit.
- the electrical current required for all the circuits controlled by the receiving unit are within
the specified range
POSITION both units such that the output terminal blocks be in an upwards direction.
INSTALL both the transmitting and the receiving units far from any components which
generate electromagnetic fields and/or heat (for example transformers, power resistors).
CONNECT the GND terminal to the earth (PE), or to the PEN (PE+N=earth+neutral). In the
latter case the PEN must always be connected to the mains supply earth.
The transmitting and receiving units must only be installed onto DIN EN 50 022 guides
Hook up the top part of the unit base to the DIN
guide.
Vibrations may interfere with the unit's performance. It is therefore advisable to use anti-vibration systems, when
necessary, to reduce the impact of vibrations on the unit.
Page 18
3.1 Installation warnings
3.2 Assembly on DIN guide
Push using a screwdriver to move the hook at the
bottom of the unit down so that the unit fits
perfectly into the DIN guide.
ENGLISH
LIKTCIU2