OPENING THE
SIDE COVER
You can find a quick release at the top of each
side cover.
Pull each quick release in the direction of arrow
and you can open the cover (Refer to fig. 3)
PASTING OPERATIONS
Swing out material support brackets from under paste tank.
Put the material shaft in the center of the bolt of material and set it on the bolt supports (shown Fig. 4)
after sliding on material discs and locking setscrew.
Pour paste into the paste tank. (Refer to Fig. 6). Do not fill paste higher than lower line of adjustable
roller. Close and latch side covers. Rotate the reverse feed rubber roller to distribute paste.
Adjust the thickness of paste by moving the adjusting lever in the direction of the arrow (shown in Fig.
3), move adjusting levers on both ends. Check paste thickness by running finger over paste roller. Set
the adjusting levers at a suitable position at each end.
Fig. 4
bolt
quick release
adjusting lever
Pull out the material and lay it on the paste
roller as (shown in Fig. 5) after opening the
side covers. Close and latch the side covers.
The material will be coming forward (paste
side up) from behind the reverse feed roller.
Two trestles in front of the machine holding
a board of about 26- 28 inches wide parallel
to the machine, can be used to fold your ma-
terial. Alternatively you can put two narrow
tables at right angles to the machine and
side cover
walk between them.
You can also fold directly against the ma-
chine without using a table or use our option-
al booking table. (Refer to page 5)
( CONTINUED ON NEXT PAGE )
Fig. 3
ADVANCE-EQUIPMENT.COM