Interconnection Diagram - Briggs & Stratton 071057 Manual De Instalación

Ocultar thumbs Ver también para 071057:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Interconnection Diagram

The illustration on the following pages shows a completed transfer
switch installation. Each installation layout may vary.
Illustration callouts are:
A1 - From Utility to First Service Panel
A2 - From Utility to Second Service Panel
B1 - Current Transformer
B2 - Current Transformer
C - Dipswitches
D - T/R and GND to Generator
E - CT Terminals
F - Transfer Switch Contactors
G - UTILITY 240VAC to Generator
H1 - Transfer Switch Neutral Terminal
H2 - Transfer Switch Neutral Terminal
J - Generator
K - Generator Ground Terminal
L - Generator Neutral Terminal
M - Generator Circuit Breaker
N - Ten pin Connector
P - Two pin Connector
R1 - Main Distribution Panel 1
R2 - Main Distribution Panel 2
S1 - Distribution Panel Neutral Bus
S2 - Distribution Panel Neutral Bus
T1 - Distribution Panel Ground Bus
T2 - Distribution Panel Ground Bus
U1 - Transfer Switch Ground Terminal
U2 - Transfer Switch Ground Terminal
V1 - Load Connections to Distribution Panel 1
V2 - Load Connections to Distribution Panel 2
W1 - Service Entrance Breaker - UTILITY 1
W2 - Service Entrance Breaker - UTILITY 2
X - Generator Disconnect
Y - Generator Connection
Z1 - Utility Connection
Z2 - Utility Connection
9

Publicidad

Tabla de contenido
loading

Tabla de contenido