Hergom MALLORCA Instrucciones Para Instalación, Uso Y Mantenimiento página 56

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Position the base under the
hood taking the previously
marked out circle as a
reference point
NOTE: Considering that in special assemblies (more than 2.80 metres and great heights) the tubes are
positioned from the roof with a section of special tubing ordered from the manufacturer, it is a good idea to
measure the height of the premises so that the correct dimension for this section of tubing may be
calculated.
For the version with glass the procedure for asssembling the tubes and the hood is carried out as explained
in the preceding paragraph (special assemblies) adapted to the height of the premises. To anchor the "tube
support" veneer, if the roof is not higher than 2.80 metres, screws are used going through to the wrought
iron plate creating a "sandwich" effect.
Subsequently place the base in the vertical part of the set as shown in the illustration "Positioning the base"
on this page.
For the version without glass once the section of tubes and the hood have been suspended the base and
the small iron plates for the support are put in position which join this to the hood.
For the assembly to be carried out correctly it is a good idea to use the base levellers and the height
regulating system for the tubes positioned on the roof.
See annex 1 –Putting the hood onto the base prior to further action.
POSITIONING THE BASE
56
Adjust the levelers in the lowest side
as shown in figure 2 and regulate it at
the same time as you position the
small iron plates for the support

Publicidad

Tabla de contenido
loading

Tabla de contenido