Existing Construction
1. Preparation
Existing Construction
Remove the existing finished wall and wallboard materials from a
36" (91.4 cm) (H) x 24" (61 cm) (W) area at the installation
location. Make sure the existing framing is sound and secure.
Repair as needed.
New Construction
Use 2x4 lumber to construct suitable stud framing for the
installation.
Poured Concrete Construction
Measure, level, and draw a pencil line across the concrete surface
at a height of 30-3/4" (78.1 cm) from the finished floor. Mark two
bolt hole locations 7-7/16" (18.9 cm) apart on the pencil line.
Drill 3/8" (1 cm) holes in the concrete at the marked locations.
Install the concrete anchors included.
Continue to the "Install the Lavatory" section.
Kohler Co.
7-7/16"
(18.9 cm)
Concrete Wall
Poured Concrete
3
30-3/4"
(78.1 cm)
1018372-2-B