Electrical Connections - Bühler technologies TC-Standart Guía Rápida

Refrigerador termoeléctrico de gases
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
TC-Standard (+)
4.2 Installation
Run the gas supply to the cooler with a downward slope. The
gas inputs are marked in red and additionally labelled "IN".
If a large amount of condensate accumulates, we recommend
using a condensate trap with automatic condensate drain.
Our condensate drains, 11 LD V38, AK 20, AK 5.5 OR AK 5.2, are
suitable.
Glass vessels and automatic condensate drains are available
for draining condensate for external mounting below the
unit. When using automatic condensate drains, the sample
gas pump must be installed upstream of the cooler (pressure
operation) to ensure proper function of the condensate drain.
If the sample gas pump is located at the cooler outlet (suction
operation), we recommend using glass condensate traps or
peristaltic pumps.
Connecting the condensate drain
Depending on the material, build a connecting line with fit-
tings and tubing or hose between the heat exchanger and
condensate drain. For stainless steel the condensate drain can
be hung directly from the connecting tube, for hoses the con-
densate drain must be secured separately using a clamp.
The condensate drain can be mounted directly to the heat ex-
changer.
Condensate lines must always be installed with a slope and a
minimum inside diameter of 6 mm (1/4").
The MTG heat exchanger (in coolers with 2 heat exchangers)
can only be operated with peristaltic pumps.
4.2.1 Connecting the filter gas connections (optional)
The connection between the heat exchanger outlet and the fil-
ter inlet already has tubing. The connection G1/4 or NPT
1/4" (filter head marked NPT) for the gas outlet must be care-
fully and properly connected using a suitable screw connec-
tion.
When ordering the cooler with the option filter without Mois-
ture detector, a bypass may be connected to the filter head.
The filter head is intended for a G1/4 internal screw thread
which is plugged at the factory. To use it, unscrew the plug
and screw in a suitable screw connection. Pay attention to
leaks.
NOTICE
Installing filters limits the maximum approved operating
pressure in the system!
Operating pressure ≤ 2 bar
4.2.2 Flow adapter connection (optional)
When ordering the cooler with the option moisture detector
without filter, it will be factory installed inside a flow adapter.
The connection between the heat exchanger outlet and the
flow adapter inlet does not have tubing included. The connec-
tion G 1/4 or NPT 1/4" (flow adapter marked NPT) for the gas
inlet/outlet must be carefully and properly connected using a
suitable screw connection. Here the direction of flow is not
relevant.
BX440017 ◦ 03/2017
4.2.3 Connecting the moisture detector (option)
When ordering the cooler with moisture detector option, it
will be factory installed inside a flow adapter, or for the filter
option installed and connected in the filter head.
4.2.4 Connecting the peristaltic pump (option)
Coolers ordered with attached peristaltic pump already have
it installed and wired. Heat exchangers ordered at the same
time are already installed and connected to the peristaltic
pump.
The ø6 connection for the pump's condensate output must be
carefully and properly connected with a suitable hose and
hose clamp.
NOTICE
Installing peristaltic pumps CPsingle / CPdouble limits the
maximum permissible operating pressure in the system!
Operating pressure ≤ 1 bar
4.2.5 Connecting the heat exchanger
The gas inputs are marked in red.
On glass heat exchangers the correct position of the seal is im-
portant when connecting the gas lines (see image). The seal
consists of a silicone ring with a PTFE sleeve. The PTFE side
must face the glass thread.
Glass

4.3 Electrical connections

The operator must install an external separator for the device
which is clearly assigned to this device.
This separator
• must be located near the device,
• must be easy for the operator to reach,
• must comply with IEC 60947-1 and IEC 60947-3,
• must separate all live conductors and
• must not be attached to the power feed.
WARNING
Hazardous electrical voltage
The device must be installed by trained staff only.
PTFE
Bühler Technologies GmbH
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tc-standart +

Tabla de contenido