Bradley SN2004/IR Manual De Instalación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SN2004/IR, SN2024/IR
Rough-In Dimensions for Supplies and Drain
Notes
Maximum flow rate required to washfountain is 1.5 GPM. Size supply lines accordingly.
Supplies from Below: Stub up 2-1/2" (64).
Supplies from Above: Supplies must be located on centers of dimaensions shown to pass
through washfountain shroud and sprayhead.
Drain through floor: Stub up 3" (76).
Supplies from Below or Through Wall
Type A
Off-line vent
(P-Trap supplied by Installer.)
Top View
2-3/4"
(70)
5"
(127)
C
C L
4-1/2"
(114)
H
5"
(127)
When running supplies and drain through wall, use same horizontal measurements as shown in Top View.
Postion openings above the finished floor, at the following dimensions (to center):
Drain:
Floor-mounted units: UPC and IPC restrict the vertical
distance from the fixture outlet to the trap weir to not more
than 24" (610). Check state and local codes for variances.
Standard height floor-mounted models
with Infrared or hand control are ADA
compliant.
4
Type H
Centrally rising vent
(P-Trap furnished with unit.)
2-3/4"
(70)
C
4-1/2"
(114)
4-1/2"
(114)
H
5"
(127)
9-1/4"
(235)
Standard Height: 19-1/4" (305)
Juvenile Height: 15-1/4" (387)
6/29/12
Type B
Centrally rising vent
(P-Trap furnished with unit.)
2-3/4"
(70)
C
C L
H
8-1/16"
(205)
9-1/4"
(235)
Supplies: Standard Height: 12" (305)
Juvenile Height: 8" (203)
Key
1/2" Supply: Nominal Copper Tube
1/2" Supply Through Wall (Optional): Nominal Copper Tube
1-1/2" NPT Drain
1-1/2" NPT Vent
Supplies from Above
Type O
Off-line vent
(P-Trap supplied by Installer.)
Top View
2-3/4"
(70)
27/32"
(21)
C L
27/32"
(21)
Bradley • 215-1071 Rev. J; ECN 12-00-011
Installation
(mm)
27/32"
(21)
C
C L
27/32"
H
(21)
8-1/16"
(205)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sn2024/ir

Tabla de contenido