Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
1

Install Unit

Rough-in of plumbing lines and wall braces must be
completed before unit can be properly installed.
A
Remove Access panel and with
the help of another person, place
unit in position against wall.
B
Ensure unit is level, shimming floor unit if
necessary. Mark the wall anchor locations.
2
Connect Water Supply to Valve Assembly
A
Connect 1/2" NPT female end of stop/check
valves to supply lines. Connect supply hoses
to hot and cold inlets of the Vernatherm TMV.
Do not turn on water
until Step 4 is completed!
Bradley • 215-1071 Rev. J; ECN 12-00-011
Water Supply Gang
Valve Assembly
OPTIONAL TEMPERED LINE CONNECTION: Connect 1/2"
B
NPT female end of stop/check valve to supply line. Connect
Tempered line adapter to Gang Valve Assembly as shown.
C
Red Tube
(to Aerator)
Green Tube
(to Aerator)
Black Tube
(to Aerator)
Yellow Tube
(to Aerator)
Vernatherm TMV
Cold Supply Inlet
Hot Supply Inlet
SN2004/IR, SN2024/IR
Install suitable wall anchors (supplied
by installer) for 3/8" bolts at the marked
locations. Secure unit to wall.
Water Supply Gang
OPTIONAL Tempered Line Adapter
Assembly (S39-685)
Braided
Hose
Stop/Check Valve
6/29/12
Valve Assembly
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sn2024/ir

Tabla de contenido