Select The Power Cables; Ensure The Cooling; Protect The Drive And Input Power Cable; Install The Drive On The Wall - ABB ACS580-01 Serie Guía Rápida De Instalación

Ocultar thumbs Ver también para ACS580-01 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 45
16 EN – R6...R9 Quick installation guide
For information on reforming the capacitors, see Converter module capacitor
reforming instructions (3BFE64059629 [English]), available on the Internet at
www.abb.com/drives/documents.

Select the power cables

R0-
R4
Size the power cables according to local regulations to carry the nominal current
given on the type designation label of your drive.
R6-
R9

Ensure the cooling

R6-
R9
See table
I
on page
temperature range of the drive is -15 to +50 °C (+5 to +122 °F). No condensation or
frost is allowed. For more information on the ambient temperature and derating, see
chapter Technical data in ACS580-01 (0.75 to 250 kW) hardware manual
EN
(3AXD50000018826 [English]).
DA

Protect the drive and input power cable

DE
See tables III,
IV
If you use gG fuses, make sure that the operating time of the fuse is below 0.5 seconds.
ES
Follow the local regulations.
FI

Install the drive on the wall

FR
Warning! The drive module is heavy (42 to 103 kg / 93 to 227 lb). Use a
IT
suitable lifting device. Do not lift the module manually. Make sure that the wall
and the fixing devices can carry the weight.
NL
See figure
R6...R9 Figures A
PL
PT
RU
SV
TR
ZH
13
(UL: table
II
on page 13) for the losses. The allowed operating
and
V
on pages
14
and
on page 157.
14
for the fuses.

Publicidad

Tabla de contenido
loading

Tabla de contenido