JUNO TYPE IC-LEDT24 NEW CONSTRUCTION RECESSED
HOUSING FOR SELF CONTAINED LED TRIMS
WARNING: For your safety, read and understand instructions completely before starting installation. Before wiring to
power supply, turn off electricity at the fuse or circuit breaker box.
NOTE: Juno recessed fixtures are designed to meet the latest NEC requirements and are listed in full compliance with
corresponding UL standards. Before attempting installation of any recessed lighting fixture, check your local electrical
building code. This code sets the wiring and installation requirements for your locality and should be understood before
starting your work.
NOTE: Use of Non-Juno trims voids Juno warranty.
SAVE THESE INSTRUCTIONS
TYPE IC FOR
INSULATED CEILINGS
Figure 1
Juno Type IC fixtures are designed for direct
contact with insulating materials which are
approved for this application (Fig. 1).
Juno Air-Loc LED housings are supplied
with pre-installed gaskets for energy savings
and to comply with energy code air leakage
requirements per ASTM E283.
1300 South Wolf Road • Des Plaines, IL 60018 • Phone 800-323-5068 • www.junolightinggroup.com
INSTALLATION INSTRUCTIONS
INSTALLATION INTO JOIST
CONSTRUCTION
Hex Screws
Figure 2
Step 1. Extend bar hangers to fit between
joists. Bar hanger foot is contoured to easily
align with bottom of joist (Fig. 2). Position
fixture by hammering Real-Nails
(Fig. 3).
(Note: Bar hanger may be shortened to fit 12"
framing or smaller by breaking at score lines).
Step 2. Slide fixture along
bar hangers into desired
location. Use locking screws
or slot to secure (Fig. 4).
Step 3. Follow steps 1-4
under Electrical Connection.
Step 4. When installing in drywall, cut
appropriate sized hole. After installing drywall,
if necessary, adjust fixture for ceiling thickness
by loosening hex screws that attach the round
housing to the plaster frame. (Fig. 2)
Relocating Fixture —
Nail can be removed with
hammer claw to allow easy
repositioning of fixture without
damaging bar hanger or nail
(Fig. 5).
INSTALLATION INTO
SUSPENDED CEILING
Figure 3
Figure 6
Step 1. Locate center of proposed opening on
ceiling tile and cut appropriate sized hole.
Step 2. Place ceiling tile in T-bar grid.
into joists
®
Step 3. Place fixture into
position and snap bar hanger
foot with integral T-bar
clips onto T-bars (Fig. 6).
Additional holes provided for
Figure 4
securing with wire or screws
as needed (Fig. 7).
Step 4. Follow Steps 1-4 under Electrical
Connection.
Figure 5
© 2014 Juno Lighting LLC
Figure 7
Rev 7/14
P5951
pg 1 of 2