Descargar Imprimir esta página

Suzuki 99000-990D2-211 Instrucciones De Instalación página 4

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4/11
3. From the above of the left side
of the radiator, pass the power
supply harness of the Relay
harness set B to the Pre-wiring
coupler which was separated in
step (1).
Connect to the Pre-wiring cou-
pler.
Power supply harness of
the Relay harness set
S p are pre-wiring
coupler for the
grip heater
GENUINE SUZUKI ACCESSORIES
Right lamp
harness of the
Relay harness set
View from the front side
Power supply
harness
View from the back of the LH Side Cowling
Pre-wiring
coupler of
the bike
Power supply
harness

Publicidad

loading