Weld the gate leaf drive bracket at the bottom of the gate leaf (code EDI1), ensuring that point F is on the axis of rotation of the gate leaf:
Insert the ring nut (item 2) in one of the 4 possible positions, depending on the installation of the foundation box, see image:
ZX41
ZX41
N.B.: The pin in the ring nut limits the travel of the gate leaf driving unit upon closing in the case of manual unlocking (the longest pin must be positioned in
the upper part of the foundation box)
Thoroughly grease the bush (item 1) and insert it into the central ring nut.