RDI transform Instrucciones De Instalación página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALL TOP RAIL (ALL APPLICATIONS)
12.
The mid-baluster support is REQUIRED for
cable spans over 42"; center the support in
your cable span.
WITHOUT OPTIONAL BOTTOM RAIL
Align your top beam to where the mid-baluster
support will connect, and use the mid-baluster
support foot to mark holes on the top beam.
Using a
/
" drill bit, pre-drill the holes in your
3
16
top beam.
Mount the mid-baluster support foot to the
bottom of your mid-baluster support using 2
#10 x 1" screws (component U) (Fig. 20). Mount
the mid-baluster support to your deck surface
using #8 x 1.5" screws (component T) (Fig. 21).
Drive two pan-head screws (component S)
down through the top beam to connect the
mid-baluster support to the top beam (Fig. 21).
8
13.
Align the top beam with the marks made in
Step 2, ensuring the bottom of the top beam
rests squarely on your mid-baluster support.
Secure the upper bracket & beam to the
post using 6 mounting screws (component
K), 3 per bracket (Fig. 22). Begin with the
bottom center screw as shown to avoid
misalignment.
(Fig. 20)
(Fig. 21)
14.
Set the drill guide (component H) on top of
the bracket, next to rail post. Using a
bit (Fig. 23, 24), drill from top of the guide
through top bracket and beam. Repeat on
other end of rail.
Tip: Ensure drill bit is long enough so that
drill chuck does not damage post.
Front of bracket
(Fig. 22)
/
" drill
1
8
(Fig. 23)
(Fig. 24)

Publicidad

Tabla de contenido
loading

Productos relacionados para RDI transform

Tabla de contenido