Install Mounting Bracket; Prepare The Hood - Broan Elite RM50000 Serie Manual Del Usuario

Ocultar thumbs Ver también para RM50000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALL MOUNTING BRACKET

1. Construct wood wall framing that is flush
with interior surface of wall studs.
Make sure:
a) the framing is centered over installation
location.
b) the height of the framing will allow the
mounting bracket to be secured to the
framing within the dimensions shown.
2. After wall surface is finished, secure
mounting bracket to framing using
dimensions shown.
NOTE:
- On 8' ceilings, the hood distance above
cook top is :
minimum 24", maximum 28" (for Ducted
Configuration).
minimum 24", maximum 27" (for Non-Ducted
Configuration).
- On 9' ceilings, the hood distance above
cook top is :
- minimum 28", maximum 30" (the air vents
on the upper flue will be exposed
after installation).
INSTALL FLUE MOUNTING
BRACKET
DUCTED AND NON-DUCTED
1. Assemble the flue mounting bracket,
adjusting outside width as shown. Fig.5
2. Carefully center the mounting bracket
directly over the range hood location.
3. Secure the bracket assembly to the ceiling
using (2) 4.8x38mm mounting screws and
drywall anchors. Make sure the bracket is
pushed into the corner, tight against the
wall and centered over the hood.

PREPARE THE HOOD

Note: On stainless steel hoods, carefully
remove the plastic protective film from all
exterior surfaces of the hood and decorative
flues, prior to final installation.
DUCTED CONFIGURATION
1. Install the discharge collar into the duct
connector of the range hood. Fig.6
FRAMING BEHIND DRYWALL
36 3/4"= bottom of hood 24" above cooktop
42 3/4"= bottom of hood 30" above cooktop
FLUE MOUNTING
BRACKET
7 - 3/4"
(197mm)
6"
DIAMETER
DUCT
DISCHARGE
COLLAR
DUCT
CONNECTOR
6
fig.4
3.9 x 6mm
FLAT HEAD
BRACKET SCREWS
fig.5
fig.6

Publicidad

Tabla de contenido
loading

Tabla de contenido