Putting Into Operation; Electric Shock; Attaching The Masterliner En - Abicor Binzel Maxi Flex/HD Instructivo De Servicio

Ocultar thumbs Ver también para Maxi Flex/HD:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Putting into operation

6 Putting into operation
Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power source.
• Disconnect all electrical connections.

Electric shock

Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged or worn parts.
NOTICE
• Please take note of the following instructions:
• The system may only be installed and put into operation by qualified personnel
• Components must only be used in environments with sufficient ventilation.
• The interconnection (serial or parallel connection) of several power sources may result in material
6.1 Attaching the MasterLiner
NOTICE
• Ensure the MasterLiner is the correct length.
• Avoid bending the MasterLiner unnecessarily when it is laid. Laying in a cable carrier is essentially
• When suspending liners of any type, use suitable mounts, strain relief devices for the wire feeder and
The section below presents and describes the installation using a QC quick connector.
EN - 10
DANGER
WARNING
 3 Product description on page EN-4
(in Germany, see TRBS 1203).
damage.
possible. However, breaches of the minimum bending radii can cause damage and wire feed
irregularities. Note the bending radii for use when dynamically laying the MasterLiner:
 3.2 Suspension/total bending angle of all bending radii on page EN-6
wire drums as well as the total wire feed distance.
MasterLiner Maxi Flex/HD; Basic Flex/HD

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Basic flex/hd

Tabla de contenido