SMA Solar Technology AG
1
Information on this Document
1.1
Validity
This document is valid for:
• SHP 125-US-20 (Sunny Highpower PEAK3)
• SHP 150-US-20 (Sunny Highpower PEAK3)
1.2
Target Group
The tasks described in this document must only be performed by qualified persons. Qualified
persons must have the following skills:
• Knowledge of how an inverter works and is operated
• Training in how to deal with the dangers and risks associated with installing, repairing and
using electrical devices and installations
• Training in the installation and commissioning of electrical devices and installations
• Knowledge of all applicable laws, standards and directives
• Knowledge of and compliance with this document and all safety information
1.3
Content and Structure of this Document
This document contains safety information as well as graphical instructions on installing and
commissioning (see page 31). Observe all information and carry out the actions illustrated
graphically in this document in the specified order.
The latest version of this document and the comprehensive manual for installation, commissioning,
configuration and decommissioning are to be found in PDF format and as eManual at www.SMA-
Solar.com. You will find the QR code that links to the eManual on the title page of this document.
You can also call up the eManual via the user interface of the product.
Illustrations in this document are reduced to the essential information and may deviate from the real
product.
1.4
Levels of Warning Messages
The following levels of warning messages may occur when handling the product.
Indicates a hazardous situation which, if not avoided, will result in death or serious injury.
Indicates a hazardous situation which, if not avoided, could result in death or serious injury.
Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
Quick Reference Guide
DANGER
WARNING
CAUTION
SHPxxx-US-20-IS-xx-11
1 Information on this Document
3