LG 18K BTU Instrucciones De Instalación página 6

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

• Select and mark the position for fixing
bolts.
• Drill the hole for set anchor on the face
of ceiling.
• Insert the set anchor and washer onto
the suspension bolts for locking the
suspension bolts on the ceiling.
• Mount the suspension bolts to the set
anchor firmly.
• Secure the installation plates onto the
suspension bolts (adjust level roughly)
using nuts, washers and spring
washers.
CAUTION
Tighten the nut and bolt to prevent
unit falling
Old building
1 Set anchor
2 Plate washer
3 Spring washer
4 Nut
5 Suspension
bolts
• Local supply
¤ Set anchor
¤Ł Plate washer
¤Ø Spring washer
¤Œ Nut
¤º Suspension bolt - W3/8 or M10
6
New building
- M10
- M10
- W3/8 or M10

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

24k btu36k btu60k btu

Tabla de contenido