Make sure the equipment used for lifting and transport can take the boiler's weight, specified on the data plate and in this manual.
During transport and storage, avoid exposure to rain or persistent humidity.
The boiler must only be moved in a vertical position by forklift, resting on the base
Use suitable equipment to remove the boards or wooden parts of the boiler packing.
Disposal or recycling of the packing must be done by the end user, complying with local regulations on waste and keeping it
out of the reach of children or disabled persons.
The boiler must always be moved vertically. Particular care must be taken to ensure that the door and glass are protected by
mechanical shocks that compromise their integrity.
Place of installation, positioning and fire-prevention safety
After preparing the water and electrical connections (by a qualified technician), open the packing and remove the boiler from pallet.
After removing the protective packing, be careful not to damage the mechanical and electrical parts by knocking or splashing with
water.
Place the boiler in the required location, making sure it:
•
complies with the requirements of the regulations in force;
•
complies with correct operation of the unit;
•
is possible to operate and service the unit in any position needed to do the work;
•
is provided with adequate ventilation from the outside;
•
is provided with a suitable fume exhaust system;
•
is provided with an approved, grounded power socket.
The unit is suitable for operation in technical environments with min. temperature not below 0°C; it comes complete with an antifreeze
function that activates the heating pump for system water temperatures below 6°C, safeguarding: heating chamber, heating/DHW
circuit. The antifreeze function is active only when the boiler is electrically powered.
The boiler must also be suitably separated from flammable or combustible materials by air spaces or the use of appropriate protective
insulation; floors and/or ceiling-coverings in flammable or heat sensitive material must be protected by panels of insulating material.
Make sure there are spaces at the sides and rear of the boiler, necessary for servicing and cleaning the unit, fume ducts and the flue.
Also make sure the pellet hopper is easily accessible for loading the fuel.
Use and maintenance manual
HR EVO 200-250 SMART
Rev.0 21/12/2020
Pag.23