PREPARE FIXTURE FOR INSTALLATION
1. Open latches (4) by pressing outward to disengage from dif-
fuser (2). Remove Diffuser (2).
2. Open wireway cover (3) by removing the four screws (6) w/ a
phillips head screw driver.
3. Remove fixture components and parts pack(s). Check that all
parts are included. See Fig 1.
4. Disassemble conduit fitting (5) installed on end of Fixture Hous-
ing (1).
FLUSH MOUNT (CEILING/WALL)
If mounting to a metal surface- additional hardware will need
to be purchased.
5. Locate the two screw boss locations on inside of fixture housing
(see fig 2). Drill 3/16" holes through the center of each boss.
6. Mark location for two mounting holes 20" apart on mount-
ing surface and drill 3/32" pilot holes.
If drill encounters ceiling joist, drill 3/32" pilot holes in joist
for mounting with 1½" wood screws.
First place a metal flat washer (10) onto 1½" screw (8). Then
place a rubber washer (11) onto wood screw (8). Insert 1½"
wood screw (8) through hole in plastic housing (1). The rubber
washer (11) should be against the inside for plastic housing (1)
when installed correctly. See Fig. 3. Tighten screws to secure
fixture. (Do not over tighten screws- could damage housing).
If drill does not encounter ceiling joist, drill a 1/2" hole in
mounting surface for mounting with toggle nut and 3" screw.
First, place a metal flat washer (10) onto 3" screw (9). Then,
place a rubber washer (11) onto the 3" screw. Insert screw
through hole in plastic housing (1). The rubber washer (11)
should be against the inside of plastic housing (1) when in-
stalled correctly. See Fig. 4
Screw toggle nut onto 3" screw approx. 1/4". Push toggle nut into
pre-drilled hole. Push screw into hole until toggle expands. See
Fig. 4. Tighten screw to secure fixture. (Do not over tighten screws-
could damage housing).
page 4
Screw Boss
Fig 2
Fig 3
Fig 4