Lithonia Lighting SGLL 24 PIR Instrucciones De Instalación página 6

Tabla de contenido

Publicidad

10) To install diffuser (14) - starting at one end of housing, insert diffuser
slot onto edge of housing- Carefully squeeze diffuser to engage opposite
side with housing. Continue this action down length of diffuser until fully
installed onto housing.
If using only one fi xture- skip to Step 20. If there are other fi xtures to be
installed on this chain- proceed with next steps.
Installing next fi xtures in chain
(Note will require (2) #10 wood screws or (2) 3/16" toggle bolts- not
supplied)
As noted above, locate end with words "Linking Output Max 4 fi xtures" on
previously insalled fi xture, this is your connection point to connect new
fi xture in chain. - See Fig 4
11) To remove plug cover (9)- gently insert fl at blade screwdriver into slot on
either side of cover. Gently pry upward on plug to remove.
12) Insert Row Connector (13) into installed fi xture until fully installed.
13) The remaining fi xtures in the chain will need to be secured to mounting
surface.
14) To mark location for fi rst mounting screw- From the end of the installed
fi xture, measure 1-7/8" (4.7cm) and mark point on ceiling that is on center
with installed fi xture.- See Fig 5
From that point, measure 21-1/16" (53.5cm) to next screw location. Place
mark on ceiling.
15) Drill 1/8" pilot holes at each location
If drill encounters ceiling joist, install #10 wood screw leaving approximately
3/16" space between head of screw and ceiling.
If drill does not encounter ceiling joist, enlarge hole(s) in ceiling to accommo-
date the 3/16" toggle bolt and nut. Install toggle bolt leaving approximately
3/16" space between head of screw and ceiling.
16) For fi xture to be installed, locate fi xture end that says "Power cord input"
and remove plug cover.
17) Remove diffuser and open wireway cover (2) - see previous steps 2 and 3.
Lift fi xture housing to ceiling inserting screw heads into keyhole slots.
Slide fi xture toward installed fi xture and insert row connector into new
fi xture until fully installed.
18) Tighten screws to secure fi xture to ceiling
19) Close wire way cover (2), adjust PIR sensor (6) and install diffuser (14)-
see previous steps 8-11. Once all fi xtures have been installed- reinstall
Port covers (9) on any open fi xture ports.
20) Turn on electricity at fuse or circuit breaker box and verify success of
installation.
Suspended Mount Installation
1) Install two hooks (not supplied) in ceiling.
2) To Install power cord t(o 17) fi xture- Locate end of fi xture noted "Power Cord
Input" and remove Logo plug (9) to expose power cord port. -See Fig 6
3) To remove plug cover (9)- gently insert fl at blade screwdriver into slot on
either side of cover. Gently pry upward on plug to remove.
4) Unbundle power cord (17) and plug fi tting into end of fi xture.
Note: Maximum distance to electricial outlet is determined by the length of
the power cord provided.
5) If using open style hook-
Place adjustable end of cable assembies onto ceiling hooks- (see Fig. 7).
If using closed style hook-
Slightly loosen screws on cable assembly (do not remove screws) and
remove short end of cable from locking ferrel and thread through hook
opening. Re-insert cable back into locking ferrel and tighten screws se-
curely. (see Fig. 8)
Slot
Slot
Figure 7
Figure 9
Page 6
Figure 4
1-7/8" (4.7 cm)
Figure 5
Figure 6
Figure 8
Figure 10
Figure 11

Publicidad

Tabla de contenido
loading

Tabla de contenido