Hood Liner; Commissioning; Disassembly Of The Fire Pit; Upper Deflectors Assembly - Palazzetti ECOMONOBLOCCO MX Serie Manual De Instalación Y Manteniemiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5.8 Hood liner

For constructing of the hood liner it is recom-
mended to use flame-retardant plasterboard .
Before creating the hood liner, the control unit
must be installed.
During creation of the hood it is essential to pro-
tect the door sliding frame with nylon to prevent
dust, mortar or other foreign bodies damaging
the sliding system. Remove this protection when
the work is completed.
Make suitable side openings for the inspection of
parts.
Before carrying out the final assembly it will be
advisable to carry out a smoke test, i.e. to test the
operation of the appliance.
6

commISSIonInG

After positioning the appliance it is necessary to
perform the following operations:
6.1

Disassembly of the fire pit

1) Open the door (A) by pushing it upwards.
2) Lift and extract the combustion air deflector
(b), the grate (c), the grate support (D) and the
fire pit (E) (Fig. 13).
A
B
C
D
E
30

6.2 Upper deflectors assembly

1) Position the two upper deflectors (A) (Fig. 14).
A

6.3 Assembly of refractory bricks

6.3.1 mX 64 models

1) Place the refractory backrest (A) behind the
bracket (b) and make sure that the post com-
bustion outlet holes are centred with the slot
on the panel (Fig. 15).
A
B
Fig. 13
A
Fig. 14
Fig. 15
004778411 - 18/09/2020

Publicidad

Tabla de contenido
loading

Tabla de contenido